
Add to Cart
High Speed Metal Framing Cold Roll Forming Machine Printing Logo
Our machine | Other company 's machine | Influence of the machine | |
Machine's base | High strength H350 / H400 steel. machine through milling macine after welding | H270 steel mark, after welding use manual polish | keep base in the same horizontal line, ensure product standard |
Roller material | High grade No.45 forged steel, with digital-controlled procession, Plated with 5 um chrome coated | Normal No. 20 steel with Simple polished and have no coating | Roller will have longer use life and ensure the products have same size,no nick on the surface. |
Side wall | Use high strength16mm thickness steel panel mark | Use 12 mm thickness steel panel mark | Ensure machine harder to deform, keep the product accurate and stable |
Active shaft material | High grade solid No.45 carbon steel, Shaft diameter is 72mm. surface CNC polish treatmen | Normal No. 45 steel with no surface treatment | Improve the integrated mechanic feature of the shaft. and ensure the shaft stability keep product standard |
Electrical elements | PLC control panel, transducer imported from Mitsubishi of Japan. Other elements from famous suppliers in China | All the elements are made in china | Machine become more accurate and more stable |
Cutter blade | Cr12 mould steel with quenched treatment | Normal high strength steel without quenched treatment | Stable the integrated mechanic feature of the cutter blade,harder to deform, longer blade's life, ensure product standard |
1. Make steel frame to build ceiling, drywall, roofing and others.
2. They could help you print your company logo, brand name, production date and other related information on the finished products.
3 If you need to curve or press logo on it, our machine also can help you make that.
4. those metal framing machine could punch holes according to your requirement meanwhile.
5.Fully automatically production line, so one person could be in charge of many machines, low cost and low workforce needs, low electricity consuming.
The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
Training time: 5 days.
Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)