
Add to Cart
♥ In Botou, we are the first to do pressure roll forming machine export business
♥ As a manufacturer we are specialized in all kinds of roll forming machine.
♥ Good experience of 20 years to make roll forming machine.
♥ Good experience for export more then 40 countries.
♥ Provide best price,good quality and fast delivery.
De-coiling →feedinig→forming→step-formed mechanism →cutting →product
1 | Model No. | Keel Roll Forming Machine |
2 | Thickness | 0.3-0.8mm |
3 | Coli material | GI |
4 | The bearing capacity of manual decoiler | 6.5 tons |
5 | shaft material | 45#steel |
6 | Out diameter | Customized |
7 | numbers of forming steps | Customized |
8 | transmission | chain transmission |
9 | Forming speed | 10-15m/min |
10 | main motor power | 3kw |
11 | voltage | 380V50HZ Three-phase or as required |
12 | dimension | 5*1.3*1.3 |
13 | cutting | hydraulic cutting |
14 | blade material | Cr12 steel with quenched treated 60-62°c |
15 | control system | PLC(Delta) |
16 | length tolerance | ±1mm |
17 | spare parts | 1 easy demaged parts:conk 2pcs, fuse-link 4pcs 2 rubber mat: 1 pcs 3 bolt spanner: 1 pcs |
18 | The whole line including: Manual decoiler, roll forming machine, hydraulic station, hydraulic cutter, PLC control system, run-out table. |
Usage: It is used to support the steel coil and uncoil it in a turntable way.
Inner diameter:350-450mm
Outer diameter:450mm
Coil width:300mm
Capacity:1.5T
Advanced hydraulic system from Taiwan
Usage: It is used to provide power for cutting devices.
Power: 3kw
Usage: Automatic length and quantity measurement.
Screen: touch screen
Frequency:Delta
PLC control
PLC:Delta
2 sets with 3 meter’s long.
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)