Jiangyin Dingbo Technology Co., Ltd

Jiangyin Dingbo Technology Co.Ltd. Professional in manufacturing roll forming machine

Manufacturer from China
Active Member
10 Years
Home / Products / Cold Roll Forming Machine /

Durable Steel Shutter Door Roll Forming Machine High Speed

Contact Now
Jiangyin Dingbo Technology Co., Ltd
Province/State:jiangsu
Country/Region:china
Contact Person:MsEmma Teng
Contact Now

Durable Steel Shutter Door Roll Forming Machine High Speed

Ask Latest Price
Video Channel
Brand Name :Shenghong
Model Number :SH16-06-05-05
Certification :ISO9001 and CE
Place of Origin :China, Jiangsu
MOQ :1 sets
Price :Negotiation
Payment Terms :T/T
Supply Ability :30 SETS/ MONTH
Delivery Time :40 days after payment
Packaging Details :Container
Material of rollers :45# steel
Production Capacity :8-10m/min
Power(W) :5.5 kw
Step of rollers :13
Thickness :0.5-1.5mm
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description
Durable Steel Shutter Door Roll Forming Machine High Speed
Product Description

Drawing for you reference:

Durable Steel Shutter Door Roll Forming Machine High Speed

Parameters:

Material specification Aluminum, galvalume, galvanized and pre-painted galvanized steel.
Thickness 0.3 mm to 0.7mm.
Main motor power 4 kw.
Hydraulic station power 3 kw.
Feeding width Depends on the model of profile.
Yield stress 235Mpa(33KSI) ~ 345Mpa (50KSI).
Roll forming Speed 12 m/minute.
Cutting Tolerance +/-2.5mm(length≤5000mm); +/-3.0mm(5000mm<length≤10000mm).
Manual Uncoiler Max. Capacity: 3000kgs.
Coil inner diameter 508mm.
Voltage As per customer’s request.
Numbers of stands 12 stands/stations/pairs for each roll forming system.
Type of cutting Roll-formed and length-set profile cutting.
Roller Material High grade No.45 forged steel, coated with hard chrome.
Active Shaft Material

High grade No.45 carbon wrought steel,

which can improve the integrated mechanic feature of the shaft.

Electric Elements

PLC control panel, transducer imported from Mitsubishi of Japan.

Other elements are from famous suppliers of China.

Cutter blades Cr12 mould steel with quenched treatment.

Working steps:

Uncoiling the sheet --- Infeed guiding --- Roll forming --- Rectifying the straightness ---

--- Measure length --- Cutting the panel --- panels to the supporter (option: automatic stacker).

After-sale Serive

The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
Training time: 5 days.
Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)

Inquiry Cart 0