Application of Shutter Door Roll Forming Machine
This shutter door forming machine uses galvanized steel sheet, colored armor plate or aluminum plate as the material plate. The products produced by this roller shutter roll forming machine are bright in colored, against fading, resistant to rust, and be widely used in shops, working departments, warehouses, and fire partition. Its strength is three times higher than aluminum alloy door.
Shutter Door Roll Forming Machine Technical parameters
Items | Specifications | |
Material of coil | Material | GI |
Material Width | As per sketch | |
Material Thickness | 0.6-1mm | |
Manual Uncoiler | 3 tons | |
Forming system | Rolling Speed | 10-15m/min |
Roller Stations | 13Stations | |
Roller Material | Gcr15, quench hardness 55-58° | |
Shaft Material | 45#steel | |
Shaft DIA | D56mm | |
Main Motor Power | 5.5kw | |
Side Plate | Wall Plate | |
Way of Drive | Chain | |
Hydraulic Cutting and punching | Hydraulic cutting Power | 3kw |
Material of blade and mould | Cr12Mov | |
Tolerance | +1.5mm | |
Electrical control system | Electric Source | 380V, 50HZ,3 phase |
PLC Control System | Panasonic | |
Encoder | Omron |
Main Components
No. | Name | Qty |
1 | Manual uncoiler | 1 |
2 | Main roll forming machine | 1 |
3 | PLC Control box | 1 |
4 | Hydraulic pump station | 1 |
5 | Output table | 2 |
Profile drawing to design of Shutter Door Roll Forming Machine
Machine pics
After service
Shipping pics
FAQ
1. Q: What's the warranty period? (24hours online)
12 months warranty period, starting from the date of the successful installation and commissioning of the equipment at the Buyer’s Installation site. During which all parts damaged because of quality problem will be changed for free.
2. Q: Do you have installation and commissioning service?
A.If buyers come to our factory to inspect, the training to install and operate is provided face to face. If not, manual and video is provided to show how to install and operate.
B. If buyer need we will send technician to buyer site to do installation and commissioning and training.
C.installation and commissioning cost: One engineer will visit Buyer’s workshop for installing, commission and training. The buyer has to pay USD100/per day and visa fee, air tickets fee, accommodation and food, necessary communication, etc.
(Normally ,It takes about a week to install )
3. Q: What’s your after-sales service ?
We provide 24-hour online service for our customers.
And we are happy to give advice and also have skilled technicians available to maintain the machine overseas to customers’ workshop if needed.
4. Q: What's your delivery time ?
Normally we can finish production and testing within 45-70 days after receiving deposit. Some machines in stock, can be delivered at any time
5. Q: You are trading company or factory?
We are Manufacturer, and we export our machine by ourselves.
6. Q: Do you provide customized machine?
Sure, we can design the machine according to the requirement and profile drawing you provide. Our engineers can offer the best professional solution to our worldwide clients.
7. Q: How to visit your factory?
We are in jiangyin city,belongs to Jiangsu province,
near Shanghai. If you arrive at Shanghai Airport,we can pick you up
It is 160 kilometers from Pudong Airport, about 3 hours.
It's 110 kilometers from Hongqiao airport, about 2 hours; It's 125 kilometers from downtown Shanghai about two and a half hours.
It is very convenient.Please let me know if you have booked the tickets
so that I can prepare and book a hotel for you,we will arrange for car to pick you up.
By high speed train from Shanghai to East Wuxi (Wuxi Dong station), half an hour.