Add to Cart
C and U channel for stud & track roll forming machine with fast speed 10-30m/min
Product Descriptions
Stud and track roll forming machine production is a new kind of building materials, with the development of modernization construction in our country, light steel keel forming machine in the production of light steel keel is widely used in hotels, terminal, transport station, station, car playground, shopping malls, factories, office buildings, old building renovation, interior decoration, ceiling and so on.
Version to design
Working Flow
Decoiler -- Feeding -- Straighten -- Punching --Roll forming -- Shear -- Output
Product Parameters
Model Number | DBRF |
Condition | New |
Production Capacity | 10-15m/min |
Forming Speed | Max 12m/min |
Weight | 5-15T |
Thickness | 0.3-0.8mm |
Roller Stations Hgf | 7-15stations rkujmjkuik75k8uk5476i765k8 |
Roller Material | 45#steel |
Cutting blade material | Cr 12mould steel |
Material of shaft | 45#steel |
Diameter of shaft | 65-95mm |
Motor Power | 4-7.5kw(Depend on final design) |
Hydraulic Power | 3kw(Depend on final design) |
Voltage | 380V 50Hz 3Phases |
Length Tolerance | +-1.5 |
Drive Way | Chain transmission |
Chain Size | 0.6-2inch |
Main Components
3 ton de-coiler | 1 set |
Main roll forming machine | 1 set |
Punching device | 1 set |
Cutting device | 2 sets |
PLC Control box | 1 unit |
Hydraulic station | 1 unit |
Output table | 2 units |
Safety cover | 1 unit(Optional) |
Application pictures
It can be used in the main body stress structure of the large and medium-size enterprises civil construction, like the plant, warehouse, locomotive shed, hangar, exhibition building, theatre, stadiums, roofing load-bearing load and wall surface support of the arbour.
Customers visiting
Packing case
FAQ
1. Q: What's the warranty period? (24hours online)
12 months warranty period, starting from the date of the successful installation and commissioning of the equipment at the Buyer’s Installation site. During which all parts damaged because of quality problem will be changed for free.
2. Q: Do you have installation and commissioning service?
A.If buyers come to our factory to inspect, the training to install and operate is provided face to face. If not, manual and video is provided to show how to install and operate.
B. If buyer need we will send technician to buyer site to do installation and commissioning and training.
C.installation and commissioning cost: One engineer will visit Buyer’s workshop for installing, commission and training. The buyer has to pay USD100/per day and visa fee, air tickets fee, accommodation and food, necessary communication, etc.
(Normally ,It takes about a week to install )
3. Q: What’s your after-sales service ?
We provide 24-hour online service for our customers.
And we are happy to give advice and also have skilled technicians available to maintain the machine overseas to customers’ workshop if needed.
4. Q: What's your delivery time ?
Normally we can finish production and testing within 45-70 days after receiving deposit. Some machines in stock, can be delivered at any time
5. Q: You are trading company or factory?
We are Manufacturer, and we export our machine by ourselves.
6. Q: Do you provide customized machine?
Sure, we can design the machine according to the requirement and profile drawing you provide. Our engineers can offer the best professional solution to our worldwide clients.
7. Q: How to place order ?
Inquiry---confirm the profile drawings and technical specification and price----confirm the PI---arrange the deposit or L/C---start production-- do inspection--- Shipment
8.What are your terms of payment ?
First payment: 30 % by T/T, second payment: 70% by T/T, after the successful inspection at seller’s workshop, and before delivery.