Jiangyin Dingbo Technology Co., Ltd

Jiangyin Dingbo Technology Co.Ltd. Professional in manufacturing roll forming machine

Manufacturer from China
Active Member
10 Years
Home / Products / Cold Roll Forming Machine /

Roofing Sheet Double Layer Roll Forming Machine For Floor Deck Panel

Contact Now
Jiangyin Dingbo Technology Co., Ltd
Province/State:jiangsu
Country/Region:china
Contact Person:MsEmma Teng
Contact Now

Roofing Sheet Double Layer Roll Forming Machine For Floor Deck Panel

Ask Latest Price
Video Channel
Brand Name :Shenghong
Model Number :SH16-06-05-08
Certification :CE ISO
Place of Origin :China, Jiangsu
MOQ :1 sets
Price :Negotiation
Payment Terms :T/T
Supply Ability :30 SETS/ MONTH
Delivery Time :40 days after payment
Packaging Details :Container
Type :Tile Forming Machine
Tile Type :Steel
Use :Roof
Production Capacity :15-18m/min
Power(W) :22kw
Voltage :380v/50hz/3phase
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description
Roofing Sheet Double Layer Roll Forming Machine For Floor Deck Panel
Product Description

Standard Equipment of Machine:

Uncoiler 1 set
Guiding Equipment 1 set
Roll Forming Equipment 1 set
Post Cut Equipment 1 set
Hydraulic Station 1 pc
PLC Control 1 pc
Supporter Table 2 pc

The Technical Parameters:

Suitable raw material Color steel sheet; Galvanized steel sheet
Thickness of the material 0.8m to 1.2mm
Yield strength of material 235Mpa
Uncoiler' s loading capacity Max. Capacity: 5000Kgs. (can be increased to be 10 tons)
Forming speed About 15-20m/min
Main motor power 18Kw(Depend on final design)
Hydraulic station power 5.2Kw(Depend on final design)
Controling System Mitsubishi PLC & converter
Votage 380V, 3 phase 60Hz or according to at buyer' s requirment
Quantity of the roller group At lest 15 groups(depend on final design)
Machine dimension About 18m*1.5m*1.4m(depend on final design)
Total weight About 10000kgs(depend on final design)

After-sale Serive:

The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
Training time: 5 days.
Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)

Packaging & Shipping:

Inquiry Cart 0