Add to Cart
Drawing for you reference:
| Technical Data & Specification | |
| Productivity | Door frame as the drawing |
| Man Power Required | One operator with one assinstant |
| Set Up time | 15 mins |
| Working Hours per Day | 8 to 16 |
| Number of Stations | 18-24 sets |
| Thickness | 0.3-0.8mm |
| Main Power | 15 KW |
| Shipment Packing | one 40 FT container |
| Forming Speed | 20mtr./min(Not include shear) |
| Line Direction | Left to Right While Facing Operator Panel |
| Overall Machine Length Required | 8.5m |
| Approximate Machine Height | 1.5M |
| Complete Line Consist Of(working process) |
| Passive decoiler |
| Infeeding applicator |
| Roll forming machine unit |
| Flying saw shear |
|
Output table |
The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
Training time: 5 days.
Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)